INDUSTRY PRESET

New product development & launch

A manufacturer's internal stage-gate project from idea to pilot lot and launch, with NPD cost and funding decisions at every gate.

Fund the next stage only when evidence, budget and launch readiness support the decision.

Operating context: BY · RU · KZ · PL6 modules
AI · DE

Digital employees run the work — AI is not a side panel

They read the same documents as your team, prepare the next action, surface exceptions and keep the decision trail inside the process.

You set the authority. Payments, goods receipts and shipments always wait for a person. Everything else, customer messages included, starts as a suggestion and runs on its own only once you allow it and verified results back it.

  1. DAY 1See the process working

    Choose an industry preset and start with realistic demo data; the team sees the target flow before migration.

  2. FIRST WEEKConnect real evidence

    Import or connect source data. Digital employees observe, draft and expose gaps while people confirm decisions.

  3. TARGET · 4 WEEKSMove the operating loop

    For a typical 50-person company, the target is four weeks. Source quality, integrations and legal requirements can change it.

01

One traceable process, not disconnected apps

Idea to launch: stage-gate
  1. 01Project gate
  2. 02Plan
  3. 03Supply
  4. 04Execution
  5. 05Evidence & release
  6. 06Cost & margin

One process, one dataset and a decision trail at every hand-off.

02

Walk through the operating chain and test your impact hypothesis

New product development & launch

Choose a hand-off to see how a digital employee prepares the work and where your team keeps authority. Then replace the example assumptions with your own operating numbers.

Illustrative starting assumptions

Interactive process walkthrough

Idea to launch: stage-gate

The selected hand-off changes the explanation, not your data or system state.

Project gate
Signal

A delay, threshold breach or missing piece of evidence is detected in this hand-off.

Digital employee prepares

Binta gathers the linked records, checks dependencies and drafts the next safe action.

Your team decides

A responsible person confirms the exception, authority and business trade-off before execution.

Evidence remains

Source, decision and result stay connected in the operating trail.

Editable impact hypothesis

This model exposes coordination and exception cost already present in the process. It is not a quote, forecast or guaranteed saving.

Annual operating exposure in this model€176,400
Team hours potentially redirected324–756
Potential annual operating impact€21,420–€51,660
90-day validation range€5,355–€12,915

How the range is calculated

  • 48 working weeks
  • 15–35% of coordination time redirected
  • 10–25% of exception loss avoided
  • Excludes Binta fees, implementation, taxes, financing and revenue uplift
Take this scenario to a product walkthrough

We will validate the workflow and assumptions before discussing a business case.

03

What the preset brings together

04

Product proof from the working system

Demo portfolio of four active projects: 296 approved hours, EUR 14,800 awaiting invoicing and billed progress for warehouse, production, service and support projects
Demo portfolio of four active projects: 296 approved hours, EUR 14,800 awaiting invoicing and billed progress for warehouse, production, service and support projects
Demo shop-floor work orders filtered to in-progress operations: planned versus reported quantity, minutes and EUR cost, with operator reporting controls
Demo shop-floor work orders filtered to in-progress operations: planned versus reported quantity, minutes and EUR cost, with operator reporting controls